Preview Tracks:

About    Connect  

Volume 2: Psalms 11-20 is the second album from The Psalms Project, a band setting all 150 Psalms to music and including the essential meaning of every verse. Featuring a different lead vocalist on every track, Volume 2: Psalms 11-20 features a variety of musical styles appropriate to Psalms 11-20 (as well as an original setting of Psalm 121), communicating each psalm's meaning with a worshipful and passionate sound.